Before & After

This 4,000 sq. ft. courtyard in Denver is melted by (2) Munchkin 399M boilers with a #661 Tekmar control with #090 slab snow and ice melt sensor for automatic control of the system. The courtyard has 5,600’ of 5/8” Uponor Wirsbo hePex tubing underneath it’s pavers.